Kitchen renovation day 8

The guys made a lot of progress today. The microwave oven and most of the cabinets are in. The stove is in place but not connected, along with the bottom cabinets on that side. The wall is uneven, so they need to fix it before they install those cabinets.

Kitchen Remodeling Day 8Kitchen Remodeling Day 8

Leave a Reply